logo

Call us now: 01604 779017

 

Key Details

 

  • Handrail: Hot dipped galvanised to BS 729 after fabrication.
  • Handrail Recesses: Once the mould is full the handrail can be added by inserting into the preformed recesses. (see fig. a)
  • Environmental Impact: The concrete is placed into the mould through the slots shown in fig. a. Caps are fitted once the mould is filled.
  • Trashscreen: Hot dip galvanised to BS 729 after fabrication. It is fixed to the headwall with BZP steel bolts, and is both hinged and lockable for easy cleaning / maintenance.(see fig c)
  • Trashscreen fixing points: Bolts are inserted into pre-formed holes in the front face of the mould to anchor the pipe guard.
  •  Flap Valve Fixing Point: Bolts are inserted into the preformed locators to affix the flap valve(see fig. b)
{rokbox title=|Headwall Features|}images/features_page/Features_1a.jpg{/rokbox}

Installation

Ask a question or make a comment.

We would be pleased to answer any questions that you may have and hear your comments.


Security code
Refresh